top of page

How to build a commercial grade climbing wall. Part two.

If you are curious how commercial climbing gym facilities build and design Climbing and Bouldering walls, look no further! This is part two of our blog series about how we built the wall here at Skyhook, click here for part one if you missed it.

ree

So what I was unable to get picture of was the part right before this photo. We moved the column next to the anchors, and lifted the side without the footplate onto the scissor lift while it was low down to the ground. By driving closer to the anchors and slowly raising the lift, I was able to position it exactly where we wanted it, and then strap it on to the lift until I had secured the nuts on to the footplate.

ree


Second one installed!





ree

Third! You can also see how I was cooking food, at this point I was pretty much living at the business. I would go home every couple of days to do laundry and shower.


ree



They are all in!




ree

Can you see a climbing wall? The next steps were to put the top and bottom bars into place. We had already drawn the lines on the floor and cut the appropriate angles for the steel beams.


ree

Top bar installed, bottom bar in place ready for welds.

ree

Top bars are in place and tacked to hold them. Big Beefy Tacks. You can also see how we are preparing to put the steel that sticks out parallel with the floor. A clamp holding a very thick piece of angle iron on one side...

ree

... and a very tall stand on the other.

ree

Top bar lifted in and clamped on both sides. If you didn't see how a scissor lift was essential to this project before, I'm sure you see it now.

ree

Next top bar in place.

ree

And most of the top frame for the cave section is in place!

ree

Getting the first of the angle pieces in. Get the bottom lined up, then use the scissor lift to lift the top until its perfectly lined up with the connection. Getting the math right for the cuts for the top was challenging. What works on paper doesn't always work in real life! The little two by four sticking off the side of the scissor lift was incredibly useful. It kept the welders wire from getting caught in the scissor lift as it went up and down, as well as helping us not run it over as we drove around.

ree

Next bar in place, and sections are getting welded in place.

Using flat plate steel with clamps helps hold things in the proper line up for welding.
clamps and flat plate

Using flat plate steel with clamps helps hold things in the proper line up for welding.


ree

Another angle. A big thank you to My helper here! Without his expertise, I dont think I would have had the confidence to take on this project.


ree

Clamps

ree

Removing the support since we had tacked the steel in place already.

ree

Well the wall itself is getting there, we still needed to start the kids sections. What a mess! SO many things are happening at this point other then just the climbing wall! We had the steel for the trampolines, and a mess of exercise equipment I had picked up.


I think this is a pretty good stopping place for part two, click here if you would like to read part three!

 
 
 

Comments


CONTACT

12008 SW Garden Pl.

Tigard OR, 97223

 

Call Us - (503) 352.9608

Email Us - Infostaff@skyhookfitness.com

NEW TO SKYHOOK?
HOURS OF OPERATION

All Classes, Open Gym & Personal Training are by appointment only.

Members please use your Mindbody account to reserve your spots.

Check our schedule to find open gym times. We're open for information and tours at 12pm on weekdays.

Monday: 2:00-9:00pm

Tuesday: 2:00-9:00pm

Wednesday: 2:00-9:00pm

Thursday: 2:00-9:00pm

Friday: 2:00-9:00pm

Saturday: 11:00-5:00pm

Sunday 11:00-5:00pm

THANK YOU TO OUR GENEROUS SPONSORS

bottom of page